IECC 2015
With the adoption of IECC 2015 in building codes across the country, newly constructed homes can tolerate no more air leakage than 3 ACH50. Ductwork must be no more than 4 CFM25 per 100 ft. Builders and installers need to know whether they meet these requirements while they can still make corrections. They need these tests conducted within a tight schedule. Call us today!
If you are a Third-Party Inspector or a contractor looking to have the capability to conduct blower door and duct blower tests the BPI Infiltration and Duct Leakage certification was designed for you. Learn how to perform these tests accurately and reliably and overcome the obstacles that in-process construction sites present.